Rodeo Downtown Infrastructure Project
The work to be done generally consists of infrastructure improvements to the Rodeo Downtown area. The improvements include the construction of ADA compliant sidewalks, curbs, gutters, a stormwater treatment area with landscaping components, stormdrain installation and modifications, a bike lane, Midwest Guardrail, an ADA compliant concrete path and soldier pile walls.
GFE
(click to expand/collapse)

Name | Size | ||
CCC_GFE | 1.4 MB |
Proposal & Contract
(click to expand/collapse)

Name | Size | ||
CCC_PC_4125 | 1.1 MB |
Special Provisions
(click to expand/collapse)

Name | Size | ||
CCC_NTB_4125 | 122.3 KB | ||
CCC_SP_4125 | 21.0 MB |