Ygnacio Valley Library Parking Lot and ADA Improvement Project
The work to be done generally consists of removal of asphalt concrete surface paving, base material compaction, HMA overlay, ADA ramp and crosswalk installation, and parking lot restriping.
Addendum 1
(click to expand/collapse)

Name | Size | |||
YV Library Parking Lot_ADD 1_ | 271.3 KB |
Addendum 2
(click to expand/collapse)

Name | Size | |||
YV Library Parking Lot_ADD 2_bid date change | 89.8 KB |
Addendum 3
(click to expand/collapse)

Name | Size | |||
ATT 1_Bid Schedule | 74.4 KB | |||
ATT 2_SAM 06.09.21 | 3.2 MB | |||
ATT 3_Spec Sec 84-2.02C Paint | 172.4 KB | |||
ATT 4_PTWB-01R2 Caltrans Paint Spec | 313.6 KB | |||
ATT 5_Revised Plan Set | 7.6 MB | |||
YV Library Parking Lot_ADD 3 | 114.1 KB |
Addendum 4
(click to expand/collapse)

Name | Size | |||
YV Library Parking Lot_ADD 4 | 3.2 MB |