Ygnacio Valley Library Upgrades
The project includes the demolition of the existing rooftop HVAC system and full system replacement with an all-electric HVAC system. This project also includes the replacement of the roofing system, electrical upgrades including new switchgear, and lighting upgrades in the main library floor.
CEQA
(click to expand/collapse)

Name | Size | ||
CP#25-27 NOE Ygnacio Valley Library Upgrades (Final to DCD)_signed | 935.9 KB |
CONFIRE Permits
(click to expand/collapse)

DCD Permits
(click to expand/collapse)

Front End Specs
(click to expand/collapse)

Name | Size | ||
07_Project Labor Agreement_20250911 | 186.0 KB | ||
Division A-G 2025 09 16 (1) | 1.0 MB |
Project Specs & Environmental Reports
(click to expand/collapse)

Name | Size | ||
Ygnacio Valley Library Upgrades_100% CD specs_04182025 | 4.1 MB | ||
YV Library Hazmat Review 08042025 | 812.7 KB |