Drainage Area 29G Storm Drain Line A
The work to be done generally consists of replacing a 48” culvert at two sites. Work includes removing trench plates, dewatering, trench shoring, placing 48” HDPE pipe, concrete slurry backfill and hot mix asphalt.
Addendum 1
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | |||
| Addendum_9C14 | 84.7 KB |
Addendum 2
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | |||
| Addendum #2_9C14 | 343.4 KB |

