San Pablo Dam Road and Bailey Road Signal Hardware Upgrades Project
General work description: The work to be done generally consists of upgrading traffic signal hardware, installing Advanced Dilemma Detection Zone using video/radar signal detection systems, and improving pedestrian crossing signal hardware at 9 intersections on San Pablo Dam Road between El Portal Drive and Castro Ranch Road in the El Sobrante area, and 2 intersections on Bailey Road between Canal Road and Willow Pass Road in Bay Point.
Status
Bidding Closed
Prebid Date | 6/26/23 10:00am |
Bid Date | 7/18/23 2:00pm |
Company & Contacts
Contra Costa County
Henry Hussey
henry.hussey@pw.cccounty.us
Location
El Sobrante/ Bay Point
Engineer’s cost estimate: $917,000