Rodeo Downtown Infrastructure Project

The work to be done generally consists of infrastructure improvements to the Rodeo Downtown area. The improvements include the construction of ADA compliant sidewalks, curbs, gutters, a stormwater treatment area with landscaping components, stormdrain installation and modifications, a bike lane, Midwest Guardrail, an ADA compliant concrete path and soldier pile walls.
Plans (click to expand/collapse)
Name Size
CCC_Plans_Full_4125 4.7 MB