Buchanan Field Airport (CCR) Security Upgrades

The work to be completed at Buchanan Field Airport generally consists of removing and replacing the existing airport perimeter fencing and gates, installation of new automated vehicle gates with access control, installation of pedestrian gates with access control, installation of new video surveillance equipment and security lighting improvements.
Addendum 1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
CCC_ADD1_5342 72.9 MB
CCC_InformationalHandout_5342 2.6 MB
Addendum 2 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
CCC_ADD2_5342 46.6 MB
_Geotech.zip 7.4 MB
_Utility System Maps.zip 32.7 MB
Addendum 3 (click to expand/collapse)
Name Size
CCC_ADD3_5342 40.1 KB
Q&A 1 (click to expand/collapse)
Name Size
QA #1_5342.docx 19.4 KB
Q&A 2 (click to expand/collapse)
Name Size
QA #2_5342 1.0 MB
Q&A 3 (click to expand/collapse)
Name Size
QA #3_5342.docx 41.4 KB