Drainage Area 29G Storm Drain Line A

The work to be done generally consists of replacing a 48” culvert at two sites. Work includes removing trench plates, dewatering, trench shoring, placing 48” HDPE pipe, concrete slurry backfill and hot mix asphalt.
GFE (click to expand/collapse)
Name Size
CCC_GFE_9C14 1.4 MB
Proposal & Contract (click to expand/collapse)
Name Size
CCC_PC_9C14 1.2 MB
Special Provisions (click to expand/collapse)
Name Size
CCC_SP_9C14 3.1 MB