Drainage Area 29G Storm Drain Line A
The work to be done generally consists of replacing a 48” culvert at two sites. Work includes removing trench plates, dewatering, trench shoring, placing 48” HDPE pipe, concrete slurry backfill and hot mix asphalt.
GFE
(click to expand/collapse)
Name | Size | ||
CCC_GFE_9C14 | 1.4 MB |
Proposal & Contract
(click to expand/collapse)
Name | Size | ||
CCC_PC_9C14 | 1.2 MB |
Special Provisions
(click to expand/collapse)
Name | Size | ||
CCC_SP_9C14 | 3.1 MB |