Drainage Area 29G Storm Drain Line A
The work to be done generally consists of replacing a 48” culvert at two sites. Work includes removing trench plates, dewatering, trench shoring, placing 48” HDPE pipe, concrete slurry backfill and hot mix asphalt.
Plans
(click to expand/collapse)
Name | Size | ||
CCC_Plans_Full_9C14 | 486.7 KB |