Walnut Creek Desilt Project
General work description: The work to be done generally consists of removing approximately 115,000 cubic yards of channel material from designated areas of Walnut Creek Channel roughly 2,000 feet north of Concord Avenue to roughly 3,000 feet south of Concord Avenue. Work also includes placing a stake and tape boundary between the designated area and environmentally sensitive areas, traffic control, construction of temporary access ramps, portable message signs, hydroseeding, and pre-construction and post-construction surveying.
Plans
(click to expand/collapse)
Name | Size | ||
CCC_PLAN_Full_8334 | 4.3 MB |