Three Creeks Parkway Restoration Project

he work to be done generally consists of excavating creek channel banks, stockpiling soil on adjacent parcel, installing steel soldier pile and lagging wall, installing rock slope protection, installing pedestrian bridge, installing irrigation system, hardscaping, and installing or modifying appurtenances needed to widen Marsh Creek flood control channel.
Addendum 1 - Q&A - Info (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
3CP_Addendum#1-C-4.1_R1 351.4 KB
3CP_QA1 563.3 KB
8729 - IMPROVEMENT (CENTRAL BOULEVARD WEST) 6.8 MB
Addendum_1_3CP 1.0 MB
Approved Improvement Plans 9420 6 929.4 KB
Revised Bid Item List pages 3, 7, & 8 190.7 KB