Happy Valley Road Embankment Repair

The work to be done generally consists of repair and restoration of a 250 foot stretch of northbound Happy Valley Road, approximately 0.2 mile southeast of the intersection of Happy Valley Road and Bear Creek Road. The work will reconstruct the northbound lane and restore two-way traffic to this portion of Happy Valley Road. The work includes installing an approximately 68 foot long soldier pile retaining wall with necessary safety railing and barrier on the east side of the roadway to support the reconstructed roadway and repairing settled roadway affected by the eroded embankment with structural backfill and asphalt surface. Drainage improvements will also be installed.
DBE (click to expand/collapse)
Name Size
CCC_DBE_6215 1.2 MB
Specifications (click to expand/collapse)
Name Size
CCC_PC_6215 1.2 MB
CCC_SP-6215 21.8 MB
NTB_6215 210.5 KB
Supplemental Information (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
1_CCC_Geo Invest Report_6215 6.9 MB
2_CCC_BSK Email_A_6215 1.1 MB
2_CCC_BSK Email_B_6215 815.7 KB
3_CCC_BSK Email_C_6215 920.9 KB
4_CCC_BSK Email_D_6215 835.9 KB
CCC_SP_Sec.2-1.06B _ 6215 265.7 KB