Marsh Drive Bridge Replacement Over Walnut Creek

Work generally consists of replacing the existing 10 span concrete slab bridge with a 5 span CIP/PS slab bridge. All supports utilize CIDH concrete piles. The replacement is to be done utilizing staged construction. Approach roadway, rock slope protection, temporary water diversion, and utility relocations are among other work items.