Marsh Drive Bridge Replacement Over Walnut Creek
Work generally consists of replacing the existing 10 span concrete slab bridge with a 5 span CIP/PS slab bridge. All supports utilize CIDH concrete piles. The replacement is to be done utilizing staged construction. Approach roadway, rock slope protection, temporary water diversion, and utility relocations are among other work items.
Status
Bidding Closed
Prebid Date3/8/21 10:00am
Bid Date3/23/21 2:00pm
Company & Contacts
Contra Costa County Public Works Department
Neil Leary
925-313-2278
Location
Walnut Creek, CA
Virtual pre-bid meeting will be held on March 8, 2021 at 10:00 a.m. via Zoom to cover project construction and the DBE requirements. Prospective bidders attendance is recommended but not mandatory. Virtual meeting instructions for the Zoom meeting can be found on the Contra Costa County Public Works Department’s website at www.cccounty.us/pwprojects