Alhambra Valley Road Realignment
The work to be done generally consists of realigning Alhambra Valley Road away from Pinole Creekâs northern embankment, including roadway excavation and reconstruction, asphalt pavement, establishing a roadside ditch, slope grading, fence relocation, traffic control and roadway striping and signing.
GeoTech
(click to expand/collapse)
Name | Size | |||
FINAL GEOTECHNICAL REPORT-Oct 2-2017 | 38.6 MB |
GFE
(click to expand/collapse)
Name | Size | ||
CCC_GFE_4095 | 1.4 MB |
Specifications
(click to expand/collapse)
Name | Size | ||
CCC_NTB_4095 | 126.4 KB | ||
CCC_PC_4095 | 1.1 MB | ||
CCC_SP_4095 | 14.0 MB |