Alhambra Valley Road Realignment

The work to be done generally consists of realigning Alhambra Valley Road away from Pinole Creek’s northern embankment, including roadway excavation and reconstruction, asphalt pavement, establishing a roadside ditch, slope grading, fence relocation, traffic control and roadway striping and signing.
GeoTech (click to expand/collapse)
Name Size
FINAL GEOTECHNICAL REPORT-Oct 2-2017 38.6 MB
GFE (click to expand/collapse)
Name Size
CCC_GFE_4095 1.4 MB
Specifications (click to expand/collapse)
Name Size
CCC_NTB_4095 126.4 KB
CCC_PC_4095 1.1 MB
CCC_SP_4095 14.0 MB