Walden Green 1 and 2 Landscape Improvements
Landscape renovations along the Iron Horse Trail Corridor between the Treat Boulevard pedestrian bridge and Mayhew Way, including:  replacement of high water use turf areas in Walden 1 with new plantings,  decomposed granite picnic and seating areas; replacement of central meadow area in Walden 2 with a variety of mulch and stone hardscape; removal of dead and dying vegetation; installation of drought tolerant plantings; trimming and mulching of existing vegetation to remain; renovation of  existing irrigation systems; installation of benches, trash and recycling cans.
    
    
    
    
    
    
    
            
                                                Addendum 1
                
 (click to expand/collapse)
            
            
 (click to expand/collapse)
            | Name | Size | |||
| Walden Addendum 1 | 90.0 KB | 
                                                Addendum 2
                
 (click to expand/collapse)
            
            
 (click to expand/collapse)
            | Name | Size | |||
| Walden Addendum 2 | 86.9 KB | 

