Walden Green 1 and 2 Landscape Improvements

Landscape renovations along the Iron Horse Trail Corridor between the Treat Boulevard pedestrian bridge and Mayhew Way, including: replacement of high water use turf areas in Walden 1 with new plantings, decomposed granite picnic and seating areas; replacement of central meadow area in Walden 2 with a variety of mulch and stone hardscape; removal of dead and dying vegetation; installation of drought tolerant plantings; trimming and mulching of existing vegetation to remain; renovation of existing irrigation systems; installation of benches, trash and recycling cans.
Addendum 1 (click to expand/collapse)
Name Size
Walden Addendum 1 90.0 KB
Addendum 2 (click to expand/collapse)
Name Size
Walden Addendum 2 86.9 KB