2023 Countywide Pavement Digouts

The work to be done generally consists of pavement dig outs and base failure repairs in the unincorporated Bay Point, Lafayette, Pacheco, Contra Costa Centre areas, and Kirker Pass Road. Work in the Bay Point Area (Site 1) includes mill and overlay with placement of thermoplastic striping and markings on Concord Avenue. Work in the Pacheco Area (Site 2) includes mill and overlay with placement of thermoplastic striping and markings on North Broadway. Work in the Lafayette Area (Site 5) includes mill and overlay of three cul-du-sacs; Jennifer Highlands Ct., Dana Highlands Ct., and Julie Highlands Ct. Work in all areas also includes placement of temporary paint striping, pavement failure repair, and traffic signal loop installation.
Bid Documents (click to expand/collapse)
Name Size
CCC_NTB_2025 27.7 KB
CCC_PC_2025 814.3 KB
CCC_SP_2025 9.1 MB
GFE (click to expand/collapse)
Name Size
CCC_GFE_2025 1.3 MB