Basket Removal with CPS Replacement and Trash Capture Augmentation

The work to be done generally consists of removing 88 existing trash capture basket and crescent type devices, installing 48 connector pipe screens (CPS), and 5 automatic retractable screens (ARS) and installing 2 deflector screens at four sites located in the unincorporated area of El Sobrante, Crockett, Pacheco, and Bay Point. Project will work on 101 inlets in total, and includes cleaning debris from inlets, and preparing a photo inventory of each installation.
No files available