Fred Jackson Way First Mile/Last Mile Connection

The work to be done generally consists of street improvements along FredJackson Way between Brookside Drive and Grove Avenue including constructing widened sidewalks, bulbouts and storm drain modifications and installation of street trees and irrigation. Project will also includepavement grinding, installation of SAMI (Stress Absorbing Membrane Interlayer), HMA widening andoverlay, and construction of HMA pedestrian path.
Addendum 1 (click to expand/collapse)
Name Size
CCC_ADD_4153 4.4 MB
Addendum 2 (click to expand/collapse)
Name Size
CCC_ADD2_4153 497.6 KB
Addendum 3 (click to expand/collapse)
Name Size
CCC_ADD3_4153 479.1 KB
Q&A (click to expand/collapse)
Name Size
CCC_Q&A_4153 275.6 KB
Supplemental Information (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
CCC_SUPPINFO_4153 157.6 KB
CCC_SUPPINFO_AS BUILTS_4153 5.2 MB