Alhambra Valley Road Realignment

The work to be done generally consists of realigning Alhambra Valley Road away from Pinole Creek’s northern embankment, including roadway excavation and reconstruction, asphalt pavement, establishing a roadside ditch, slope grading, fence relocation, traffic control and roadway striping and signing.
Plans (click to expand/collapse)
Name Size
CCC_Plans_FS_4095 1.2 MB