Alhambra Valley Road Realignment
The work to be done generally consists of realigning Alhambra Valley Road away from Pinole Creekâs northern embankment, including roadway excavation and reconstruction, asphalt pavement, establishing a roadside ditch, slope grading, fence relocation, traffic control and roadway striping and signing.
Plans
(click to expand/collapse)
Name | Size | ||
CCC_Plans_FS_4095 | 1.2 MB |