Alhambra Valley Road Realignment
The work to be done generally consists of realigning Alhambra Valley Road away from Pinole Creekâs northern embankment, including roadway excavation and reconstruction, asphalt pavement, establishing a roadside ditch, slope grading, fence relocation, traffic control and roadway striping and signing.
Addendum 1
(click to expand/collapse)
Name | Size | |||
CCC_ADD1_4095 | 17.2 MB |
Q&A
(click to expand/collapse)
Name | Size | |||
CCC_QA#1_4095 | 93.5 KB | |||
CCC_QA#2_4095 | 218.7 KB | |||
CCC_QA #3_4095 | 100.2 KB |